Mixed Heat Gas Power System Scheduling

Maintenance Model of Power System with Matlab and Yalmip, including the maintenance of branches and generators, and a partial mantenance is allowed for branches. The Object Functions are 1.Maximize the minimum reserve rate, 2.Minimize the cost, 3. Minimize the Variance of reserve rate(resulting in a long solution time) 使用Matlab和Yalmip进行电力系统维护的模型,包括分支机构和发电机的维护,并且分支机构可以进 对象函数是1.最大化最小储备率,2.最小化成本,3.最小化储备率的差异(导致较长的求解时间) Besides, note that the model is based on the Matlab, Yalmip, and the solver is Gurobi. It can be changed to other solvers, such as Cplex, by modifying the parameter 'gurobi' in sentence 'ops = settings('solver','gurobi''. 此外,请注意,该模型基于Matlab,Yalmip,求解器为Gurobi。 通过修改句子'ops = settings('solver','gurobi'中的参数'gurobi',可以将其更改为其他求解 If you have any idea on improving this model, please contact me. 如果您有任何改进此模型的想法,请联系我.
Alternatives To Mixed Heat Gas Power System Scheduling
Select To Compare


Popular User Interface Components Categories

Get A Weekly Email With Trending Projects For These Categories
No Spam. Unsubscribe easily at any time.
Matlab
Rating